Row 1KM then
21-15-9
pull ups
and SDHP 95/65
Power Program:
| SQUAT | BENCH | DL | |||
| 2x4 @75% | 4x4 @80% | 2x3 @80% | 2x2 @85% | 2x3 @75% | 5x2 @81% |
| SQUAT | BENCH | DL | |||
| 2x4 @75% | 4x4 @80% | 2x3 @80% | 2x2 @85% | 2x3 @75% | 5x2 @81% |
A: On the 2 minutes at increasing loads x 12
1 power clean + 1 low hang full clean (below the knee) +1 jerk
B: Back squats
6x8 at 55%